2023 Board of Directors Election - Meet the Candidates
The annual meeting / Board election will be on Saturday, March 25th, 2023. Two (2) Board of…
The Texas Department of Transportation (TxDOT) is scheduled to start a $9 million maintenance project on the JFK causeway bridge on Park Road 22 designed to maximize the bridge's life and reduce the overall life-cycle costs of the bridge. The work maintenance being performed on the bridge spans the Gulf Intracoastal Waterway, not the entire causeway.