News & President's Corner

Back to News
JFK Causeway Bridge Maintenance Project
  • JFK Causeway Bridge Maintenance Project

  • Details:

    The Texas Department of Transportation (TxDOT) is scheduled to start a $9 million maintenance project on the JFK causeway bridge on Park Road 22 designed to maximize the bridge's life and reduce the overall life-cycle costs of the bridge. The work maintenance being performed on the bridge spans the Gulf Intracoastal Waterway, not the entire causeway.

    Read More